About · Greater Bay Area
Dual-base operation — Guangzhou brand HQ + Foshan manufacturing.
Wolfer runs as two legal entities, one operational system: the Guangzhou HQ holds brand, R&D, and customer success. The Foshan plant runs the cutting, heat treatment, and inspection. Together they form a >9,000 m² operation inside the Greater Bay Area cluster.
Combined area
>9,000 m²
Bases
Guangzhou + Foshan
Region
Greater Bay Area
Founded (HQ)
2006
About
Guangzhou is southern China's business hub — closer to international customers visiting trade shows and to the airport for customer engineering visits.
Foshan is one of the Greater Bay Area's core manufacturing cities — steel supply, heat treatment, surface finishing and logistics are densely clustered, so key supply-chain steps coordinate on short notice.
Enough space for 200+ precision machines, in-house heat treatment, dimensional inspection, and finished-goods staging without compromising flow.
The two entities share one drawing system, one quote desk, one customer record, and one inspection standard.
About
Brand HQ — Guangzhou
Guangzhou Wolfer M&E Co., Ltd.
Guangzhou Wolfer Mechanical & Electrical Equipment Co., Ltd.
No. 133 Zhongsheng Road, Zhongcun Town, Panyu District, Guangzhou, Guangdong
Room 301, 3/F, Building 3, Lifeng Industrial Park
Panyu District, Guangzhou, Guangdong, China
Brand · R&D · sales · customer success · QC engineering · drawing review
Manufacturing — Foshan
Wolfer Transmission (Foshan) Co., Ltd.
Wolfer Transmission Technology (Foshan) Co., Ltd.
No. 1 Feicui Road, Yang'e Village Committee, Lunjiao Town, Shunde District, Foshan, Guangdong
No. 102, Building 7, Baofa Jewelry Industry Center
Established 2019
Precision cutting · grinding · heat treatment · inspection · packaging · shipping
Map location
Brand HQ in Panyu, Guangzhou; manufacturing base in Lunjiao, Shunde, Foshan. About 25 km apart — roughly 40 minutes by car.
Map provided by AMap. Use the buttons above to switch locations, or open an address card in AMap for details.
Related pages
24-hour quote · engineering review within one business day · ≤ 30 days to ship after approval.