Capabilities · Plant
Equipment
200+ precision machines, sequenced across cutting, heat treatment, and inspection.
Wolfer's Foshan plant runs a single integrated workflow — raw bar in one door, inspected finished parts out the other — across more than 200 precision machines. The machine list below covers the major equipment by category.
Last updated Reviewed by Luo Genwen, Production Plant Manager
-
Total machines
200+ machines
-
Cutting
Hobbing · grinding · turning
-
Heat treatment
Carburize · nitride · induction
-
Footprint
>9,000 m²
Equipment on the floor
200+ precision machines and the shop floor
A look inside the Foshan manufacturing base — machining floor, equipment condition and shop environment, so customers can see the real production conditions behind 200+ precision machines.
Capabilities
Major machinery, by category
Gear grinders — Qinchuan / Xinghe
YK7236 series, YK7250 — capable of grinding gears to ISO 1328 Class 5, OD up to Ø 600 mm.
Hobbing centers — Push Ningjiang / Maitelite
Y3150E / YKS3120 — for gear hobbing up to module 12.
Gear shaving
For surface-finish improvement post-hobbing, before heat treatment.
CNC turning centers
Ø 6 mm – Ø 300 mm × 1,500 mm. Used for gear blanks, gear shafts, machined parts.
CNC milling centers
1,000 × 600 mm bed, 3-axis and 4-axis available. Used for machined transmission parts.
Heat-treatment line
Carburizing furnace, nitriding furnace, induction-hardening machine, oil-quench setup.
Surface treatment
Black-oxide line, anodizing and electroless nickel through qualified partners.
Gear inspection center
Klingelnberg-type gear inspection center — pitch, profile, lead and runout in a single setup.
CMM
Coordinate measuring machine, Ø 0–800 mm work envelope.
Profile projector
Han Liang PREC60 — tooth-form, thread and profile verification.
Surface roughness tester
Mitutoyo SJ-410 — Ra / Rz / Rmax to drawing.
Hardness testers
Rockwell + Vickers + Brinell, full coverage 20–70 HRC.
Related pages
Continue exploring capabilities.
Ready to start a project with us?
24-hour quote · engineering review within one business day · ≤ 30 days to ship after approval.